Office Building
This low rise office building was part of a large industrial project. The client required a speedy construction method with minimal staff on site.
Installation of the wide "band beam" shell
The precast columns, edge beams and wall panels are also visible.
Primary top bending reinforcement
Top reinforcement over the band beam column support and slab continuity over the band beam.
No other reinforcement was installed on site as the steel fibre reinforced concrete topping does not require distribution steel.
Precast edge beam and band beam connection
Illustrates the rebates of the edge beam and simplicity of installation.
Soffit
Two rows of props were required for the long span of the band beam. The system provides an excellent work platform above and relatively clear space below for ongoing construction activity.
Home
Structures
Steel Fibre
Synthetic Fibre
Research
About
Free Software
Contact
Projects
Building System
Airport Extension
Airport Lounge
Office Building
Accommodation Building
Radiation Containment Facility
Backpackers Hostel
Landscape Ramp